Our New House

We are rebuilding after a fire which devastated our home last July. The pictures below show the construction of our new home starting with the logs which were delivered on December 30, 2002.  If you are thinking of building a log house, click here for more pictures.  

The pictures below and to the right are thumbnails.  Click on them to see them close up. Updated 12/6/04.


Dec 30, 2002
January 30, 2003
Jan 30, 2003.
P3010003.JPG (140294 bytes)
March  2 2003
P4060001.jpg (63155 bytes)
April 7, 2003
P5090013.JPG (143788 bytes)
May 10, 2003

P6240032.JPG (87084 bytes) June 24, 2003
""

Taking the tarp off the logs, which came all the way from Bangor Maine. 

"'

The logs are precut,  identified on the end.  The house is put together like a puzzle.

""

Standing in the family room, getting ready to put the floor trusses down on the main house.

""

1/5/03  This walk-out basement will eventually become our in  home shop and packing area.

P1080008.JPG (62734 bytes)

Every log that goes down has to be checked for level. Note the weather stripping between logs.

P2070012.JPG (94701 bytes)

2/7/03 The second floor has begun!  It will be log, so the first order of business is to carry the logs to the second floor

P2070006.JPG (69478 bytes)

The inside is framed - this view shows the ceiling trusses

P2150002.JPG (108059 bytes)

2/15/03 The second floor is going up.  The first floor has to be shoveled out after a 14" snowstorm.

P2190006.JPG (18064 bytes)

Bruce is wiring for the ceiling lights routed through the beams

P2190005.JPG (74423 bytes)

John is laying the flooring for the second floor, then covering it with plywood to protect it. 

P3010001.JPG (66145 bytes)

3/1/03 The trusses went up one day, the roof was started the next.  It's starting to look like a house!

P4090002.JPG (84248 bytes)

4/9/03 Michele makes the final measurement for the kitchen cabinets.

P5100024.JPG (56027 bytes)

Daughter Erin helps lay the tile in the kitchen.

P5240002.JPG (123018 bytes)

Three weeks after they were ordered, the kitchen cabinets are going up.

P6040004.JPG (108268 bytes)

Installing the countertops

P4270011.JPG (32478 bytes)

4/27/03 Mona the dog is keeping an eye on the taper.

P5220056.JPG (81935 bytes)

5/24/03 The doors are going in

P6250001.JPG (64315 bytes)

Window and front  door is installed

P6270003.JPG (80133 bytes)

6/27/03 Jocelyn sands the beams and log walls to remove  marks.

P6270007.JPG (64980 bytes)

John and Bill are installing wide plank pine flooring.

PC050014.JPG (311016 bytes)

Laying the foyer floor 

bookcase.jpg (44593 bytes) 

The bookcase in the finished foyer

DCP03873.jpg (120827 bytes)

The kitchen as seen from above 7/23/02

before

Jocelyn's room
 7/26/02

DCP03876.jpg (97872 bytes)

The back of the house 7/23/02. The bow window on the right was in the kitchen.

 lrfloor.jpg (32772 bytes)

We tore up the old living room wide plank flooring and reused it

lr.jpg (42628 bytes) 

Almost the same angle a week later (4/1/04)

 lrf.jpg (64327 bytes)

The Living Room

after

Jocelyn's room
8/5/03 

P5090019.jpg (131630 bytes)

The back of the house 5/9/03.  The bay window is now in Jocelyn's bedroom.

main_event.jpg (81404 bytes)

Bringing the family room carpet in through the window.