Taking the tarp off the logs, which came all the way from
Bangor Maine.
|
The logs are precut, identified on the end. The
house is put together like a puzzle. |
Standing in the family room, getting ready to put the floor
trusses down on the main house. |
1/5/03 This walk-out basement will eventually become our in home shop and
packing area. |
Every log that goes down has to be checked for level. Note the weather stripping
between logs.
|
2/7/03 The second floor has begun! It will be log, so the first
order of business is to carry the logs to the second floor
|
The inside is framed - this view shows the ceiling trusses |
2/15/03 The second floor is going up. The first floor has to be
shoveled out after a 14" snowstorm. |
Bruce is wiring for the ceiling lights routed through the beams
|
John is laying the flooring for the second floor, then covering
it with plywood to protect it.
|
3/1/03 The trusses went up one day, the roof was started the
next. It's starting to look like a house! |
4/9/03 Michele makes the final measurement for the kitchen cabinets.
|
Daughter Erin helps lay the tile in the kitchen.
|
Three weeks after they were ordered, the kitchen cabinets are
going up.
|
Installing the countertops
|
4/27/03 Mona the dog is keeping an eye on the taper.
|
5/24/03 The doors are going in
|
Window and front door is installed
|
6/27/03 Jocelyn sands the beams and log walls to remove
marks.
|
John and Bill are installing wide plank pine flooring.
|
Laying the foyer floor
|
The bookcase in the finished foyer
|
The kitchen as seen from above 7/23/02
|
Jocelyn's room
7/26/02
|
The back of the house 7/23/02. The bow window on the right was in
the kitchen.
|
We tore up the old living room wide plank flooring and reused it
|
Almost the same angle a week later (4/1/04)
|
The Living Room
|
Jocelyn's room
8/5/03
|
The back of the house 5/9/03. The bay window is now in
Jocelyn's bedroom.
|
Bringing the family room carpet in through the window.
|
|
|
|
|